Frame the rough opening for the garage door to 3 inches wider than the garage door you have selected.
Rough opening requirements for 18 garage door.
How to frame a garage door 1.
Most new doors are 6 ft.
To finish the opening cut the header and jambs from 2 lumber.
1 2 or 1 in one direction of the other will won t typically cause you to have to shop for a non standard garage door size.
Getting the rough opening size right the first time will save you from frustration when installing your doors.
For the jamb 3 4 in.
Standard garage doors in our area are 8 9 16 and 18 wide.
Next you will need to know your door height.
Standard systems require 10 inches of headroom while some require 12 inches while garage door openers often require an additional three inches of clearance.
Width of garage door opening standard widths are 8 9 10 12 14 16 17 and 18 height of the garage door opening standard residential heights are 7 7 6 8 header the header is ideally a minimum 12 wide micro laminated beam that spans the width of the garage door opening.
If the door is 7 tall frame the opening 7 1 5.
For underlayment and 3 4 in.
Frame the rough opening to a height that is 1 5 taller than the door that you have selected.
99 of the residential garage doors that we run across are different than these widths.
Knowing garage door clearance requirements will help you avoid ordering the wrong garage door set up for your needs.
Framing rough opening sizes are really quite simple.
Torsion springs mount on a bar above the door while extension springs stretch down the side of the upper tracks.
Cut four 2 x 4 trimmers to this length and nail two each to either side of the rough.
You should add 2 1 2 to the height of the actual door.
Therefore making the width of the garage door rough opening the same size as the door would be fine if you are going to use a thin layer of stucco vinyl siding or 1 by lumber.
Measure the head room the distance between the top of the door opening or door jamb header and the ceiling of the garage.
Step 3 add 6 to 14 inches to the height of the door for headroom or the space directly above the closed door.
Measure the distance from the bottom plate of the wall to a point that is 1 1 2 inches higher that the garage door height.
For finish flooring 3 8 in.
For wiggle room at the top of the door and the top of the trimmer the bottom of the header needs to be 82 5 8 in.
Add 18 inches to the height of the door.
However if you are putting bricks thick river rock stones marble or anything else on both sides that is more than 1 thick you will want the rough opening the same.