Ensure it sits flat and extends at least 8 inches above the shingles.
Roof vent flashing installation instructions.
Push down until base lies flush on rooftop.
Following manufacturer s instructions for securing the vent the roofer will likely spread plastic roof cement on the underside of the vent place it over the hole slip the flange under the top side shingles and lay the flange over the down slope shingles.
Flashing details 19 24 flashing against vertical sidewalls 19 flashing around chimneys 20 roofing ventilation 25 27 proper ventilation.
After the correctly sized collar has been selected.
Before sliding the new flashing over the vent pipe i apply strips of regular flashing tape to the bottom of the flashing pan.
Select appropriate size flashing for each vent pipe through roof.
Bend it back so that it overlaps the corner flashing.
Be sure to like and subscribe in order to help me bring you more helpful videos filled with tips and tricks i ve learned over the years.
Roof flashing installation instructions 1.
Apply a thin bead of silicone.
Panel installation should begin at the gable end of the roof opposite the prevailing rain bearing wind this will provide added assurance against wind driven rain being forced under the laps.
Cut some membrane material to seal between the vent flashing and the roof and cut an opening for the vent.
Install flexible collar over pipe.
Slide the new rain collar down over the pipe to the top of the existing collar.
Measure one panel width in from the roof edge.
Next use a reciprocating saw with a rough in blade to cut the out the marked template.
Nail flashing only where future courses of shingles will cover.
The top edge of the flashing tape is trimmed evenly around the vent pipe so the new boot flashing collar can seal to the pipe without the tape in the way.
Intake low exhaust high 25 roofing failures 28 30 how to estimate roofs 31 35 installation instructions.
How to install step flashing with a wall corner step three.
Using a sawzall cut any roofing nails in the area of the lower mounting plate flush with the sheathing.
After selecting an area to install from inside the building square the template between the roof rafters and outline with a marker.
Nail it in place with two nails one.
At this point chalk a line from ridge to eave.
Place the leading edge of the first panel along this line.
You will apply a 100 exterior or marine rated silicone caulk to the top of the existing rain collar attached to the roof flashing and also to the underside of the new rain collar.
Hammer one nail to the.
Seal the underside of the flashing as shown below.
Then set the piece down.