It is designed to cover and protect roof to wall intersections from water infiltration.
Roof to wall.
Roof to wall flashing is bent at a 110.
While stopping rain and snow at the point entry thanks to the enhanced snow screen.
The wall leg of the kickout should be applied over the housewrap cut a 2 ft square piece of housewrap and tuck one edge into the horizontal cut the same one the first piece of housewrap was slipped into and up under the housewrap on the wall by at least 5 in.
The flat roofing material must go up the wall a minimum of 12 or up the wall and over the top of the wall if the wall is less than 12 high.
Shed roof ventilation instructions.
Of net free vent area per lin.
6 six 4 foot pcs.
The gibraltar roof to wall flashing is made from trusted 28 gauge galvanized steel.
That lip is then set into a reglet or groove in this case cut into the mortar joint of the brick wall above.
Wide roll of aluminum flashing.
A bag of 2 roofing nails.
Of roof to wall vent 24 lin.
A tube of polyurethane caulk black in color new addition.
To install the roof wall flashing above the builder bent the top edge of the flashing into a 90 degree lip about 2 cm in width.
Ensure there is proper continuous intake ventilation below proposed roof to wall ventilation.
Tape over the cut in the housewrap with housewrap tape.
4 r2w end plugs.
Step 2 measure 3 out from the wall where the smartvent will bend up on the wall.
Of net free vent area per lin.
Now install the kickout flashing and step flashings up the roof as needed.
Ft that provide 6 75 sq.